Pre-Construction Planning
After deciding on the home you want, and the paperwork is complete, you will begin Pre-Construction Planning. Before breaking ground on your new home, there are many items that need attention. Here are theitems that could arise during the Pre-Construction phase of your new home. The location of your property (County, Township and Community) will determine what items will be required with your new home. One of our New Home Consultants will guide you through each step. If you prefer to sit back and let someone else handle these details, we offer customized packages that vary from doing just a few items you prefer not doing, to our "Turn Key Service." The "Turn Key Service" will handle every detail from property survey to landscaping.
3. Zoning requirements
- Well or public water source
(if well, check w/ neighbors to get idea of depth). - Septic or public sewer
(if septic, soil test through Health Dept; septic system design and approval). - Temporary Electric
(we provide the pole up to 50 feet from building site; you will need to contact
electric company to set up an account and to have them determine where
electric will come from and if additional poles or transformers are needed). - Permanent Electric
(overhead or underground; contact local Electric company) - Natural Gas or LP
if desired and available contact local provider).
- Stake the house corners on the home-site.
- Discuss driveway location and if culvert is needed.
- Discuss utility locations and any issues that could affect cost.
- Review any special circumstances related to your land.
7. Building Permits
(County, City, etc.)



